C90/DMF - The Challenge

Left
Right
The overwhelming challenges to master:
  • Interface between 2 groups
    • One for the C90
    • Other for the tape storage system
  • Understand UNICOS file systems and migration
  • Understand HPSS (tape storage system)
  • Portable to at least one other machine
  • 2 month development cycle
  • Data collection must work 1st time, no second chance
Left
Right
Slide 5